Throughout the pre-construction phase, we work with the owner and design team to help assure that the cost, scope and schedule of the work is within the owner’s expectations. Some components of our pre-construction process include:
- Real time cost estimating (from schematic design to GMP documents)
- Construction phasing and logistics studies
- Project schedule evaluation
- Value engineering suggestions
- Building information modeling structure analysis and visualization
- Constructability studies
- Market analysis
- Support through the governmental approval process.
Allow Pinnacle to help your project team, during the pre-construction process, make well informed timely decisions and ensure predictable results from the onset of construction.